Continuation of the Persian Gulf Martyrs Tunnel Operation and Lighting on the Ard-Fadagh Axis
	 
	
					
				(Gulf Storm Tunnel Complementary Operations (Balangistan
	 
	
					
				(Segment One Lamard-Dag (Airport Intermediate to Shahid Bagheri Tunnel Entrance
	 
	
					
				The second band is the Daleki axis along the Faryab junction
	 
	
					
				TUNNEL CONSTRUCTION AT REPLACING ACCESS ROAD OF KROON IV DAM & POWER PLANT
	 
	
					
				CONSTRUCTION OF FARGHOUYEH STORAGE DAM
	 
	
					
				KAWAR-FIROOZABAD REPLACEMENT ROAD TUNNELS OF TANGAB DAM
	 
	
					
				DESIGNING & CONSTRUCTION OF RETAINING STRUCTURE & EXCAVATION OF BUILDING DEVELOPMENT PROJECT OF THE STATE SUPREME AUDIT COURT
	 
	
					
				WATER DIVERSION SYSTEM OF BABAHEIDAR STORAGE DAM
	 
	
					
				CONSTRUCTION OF WATER DIVERSION SYSTEM & CAMP BUILDINGS OF CHERAGHVEIS STORAGE DAM
	 
	
					
				EXCAVATION & CONSOLIDATION OF THE GATE OF SHAFTS NO. 3 OF KAROON DAM III
	 
	
					
				KAROON DAM III – EXCAVATION & CONSOLIDATION OF A PART OF WATER TUNNEL, TRANSITIONS, VERTICAL PART OF SHAFTS, PENSTOCKS, ADITS, ETC