Project Description
The second section of the Dalki Plateau axis is part of the main Bushehr route to Shiraz and consists of two parts. The first part of the continuation of the construction axis is 6500 m long from 500 + 7 to 000 + 14 km 11 lanes with 10.40 m asphalt and 30 cm earth shoulders on each side. Major project operations include predominantly rock excavation, embankment and conventional technical construction, including a river bridge at 1100 + 400 km and a narrow bridge at Faryab and two tunnels measuring 494 and 50 meters long. The second part consists of a roundabout and access to Faryab Village and Faryab Intersection, which comprises a total of 4,700 meters of track and two bridges on the Daleki River.