EXCAVATION & CONSOLIDATION OF DIVERSION TUNNEL & ADIT OF OSTOUR DAM

21
سد استور تونل انحراف
سد استور تونل انحراف

DESCRIPTION:


Ostour Dam is constructed in a distance of 40.- kilometers away from the northeast of Mianeh in East Azarbaijan Province. The excavation and consolidation operations of the diversion tunnel, located at the support of the dam, were borne by this Company, and aiming at construction of this tunnel, two adits (totally 125.- meters in length) were excavated. The runway system was applied for constructing the body of Ostour Dam, and in order to having access to the installation place of this system and operating the same, RT1 Tunnel was excavated as well.

SPECIFICATIONS:


The other specifications of this project are as follows:

  •  Length of Diversion Tunnel: 510.- meters
  • Cross-Section Area: 200.- square meters
  • Volume of Underground Excavation: 102,000.- cubic meters
  • Type of Stone: Igneous Rock (Andesite)
  • Length of Adit: 400.- meters          Cross-Section Area: 43.- square meters
  • Volume of Underground Excavation: 17,200.- cubic meters
سایر پروژه ها

No results found.

Leave a Reply

Your email address will not be published. Required fields are marked *

Fill out this field
Fill out this field
Please enter a valid email address.