EXCAVATION & CONSOLIDATION OF THE GATE OF SHAFTS NO. 3 OF KAROON DAM III

كارون 3-حفاري گيت شفت 3
كارون 3-حفاري گيت شفت 3
كارون 3-حفاري گيت شفت 3
كارون 3-حفاري گيت شفت 3
كارون 3-حفاري گيت شفت 3
كارون 3-حفاري گيت شفت 3
كارون 3-حفاري گيت شفت 3
كارون 3-حفاري گيت شفت 3
كارون 3-حفاري گيت شفت 3

DESCRIPTION:


The two inland tunnels, which are led by four water tunnels and end to four shafts, are responsible for the transfer of water to the Karun III power plant. The specifications of these tunnels are as follows:

 SPECIFICATIONS:


  • Height: 89.- meters
  • Cross-Section Area: 145.- square meters
  • Period of Excavation & Consolidation: 12 months
  • Volume of Underground Excavation: 20,000.- cubic meters
  • Installed Bolts: 12,500.- meters
  • Weight of Mesh: 36,000.- kilograms
  • Shotcrete Area: 15,000.- square meters
سایر پروژه ها

No results found.

Leave a Reply

Your email address will not be published. Required fields are marked *

Fill out this field
Fill out this field
Please enter a valid email address.