Koohrang II Hydropower Plant Project is located in a 2-kilometer distance away from the southeast of Chelgard Village, west of Shahrekord in Chaharmahal and Bakhtiari Province. The construction operations of the head pond of Koohrang II Hydropower Plant are inclusive of embankment of the head pond body with concrete and masonry operations of the intake structure of the power plant, spillway, chute, sealing the internal surface of the head pond with PVC Geomembrane and procurement and installation of the precision instruments of the body, fencing with masonry materials and concreting around the penstock pipes from the head pond to penstock bridge, which were thoroughly performed and constructed by this Company. The head pond is located at the end of the watershed system and has the following particulars:

SPECIFICATIONS:


  • Volume of Excavation: 50,000.- cubic meters
  • Volume of Head Pond Body Embankment: 145,000.- cubic meters
  • Volume of Spillway Concreting: 5,500.- cubic meters
  • Volume of Intake Concreting: 5,000.- cubic meters
  • Volume of Culvert Concreting: 2,800.- cubic meters
  • Volume of other Concreting Operations: 10,000.- cubic meters
  • Reinforcement Operations: 420,000.- kilograms
  • Volume of Formwork Operations: 10,000.- square meters
  • Installation of PVC Geomembrane: 17,150.- meters
سایر پروژه ها

No results found.

Leave a Reply

Your email address will not be published. Required fields are marked *

Fill out this field
Fill out this field
Please enter a valid email address.